← Banking With Billy News
HUT has secured a 15-year, $9.8 billion lease for 352MW at its Beacon Point data center campus in Texas, advancing its AI infrastructure buildout. The deal doub
BWB News TV • 2026-07-20 12:11 UTC • By Billy Odell Tucker-Robinson
HUT has secured a 15-year, $9.8 billion lease for 352MW at its Beacon Point data center campus in Texas, advancing its AI infrastructure buildout. The deal doubles the tenant’s contracted IT capacity to 704MW and lifts secured utility capacity at the site to 1GW.
📚 More from Billy’s World
Banking With Billy News Network — bankingwithbilly.com
Discord: discord.gg/VHxwmR5j4Y •
YouTube: @BankingWithBilly